A Digital Building Platform Service Provider

Provides products and services covering the entire life cycle of buildings.

01
04
bg-bg-left

We use TAS, TRB, TBQ for this project. It takes about 1 month.Our feelings are as follows: 1. We build the TRB model first, then import to TAS; import BQ into TBQ, connect TAS & TRB with TBQ, link the quantity of the corresponding entity with the BQ item, and compare the contract BQ with the actual quantity quickly. Save us lots of time! 2.The structural drawings of this project use China's flat construction drawings, and the efficiency of TRB modeling is still high. The intuitive rebar 3D make us to check easily.

Edwin Chen/Tan mi/Xuling

Edwin Chen/Tan mi/Xuling

Quantity Surveyor Giant Leap Construction

Join Glodon at QSApex 2024 for Groundbreaking Insights into 5D BIM

Join Glodon at QSApex 2024 for Groundbreaking Insights into 5D BIM

Oct 05.2024 13:00-20:00 ? GMT + 8
Offline
Meet Glodon at UK Construction Week Birmingham 2023

Meet Glodon at UK Construction Week Birmingham 2023

Oct 04.2023 18:15-19:00 ? GMT + 8
Offline
男男被藤蔓疯狂入侵♂漫画,支持导入图片的象棋软件,顶顶漫画下载地址,搞黄软件大集全,男生和女生一起相差30分的软件app,色花堂色花堂社区花堂论坛,警笛头下载,labstill被各种怪物抓住,白莹程悠雪琳无删减,一级天码黄色片